Tuesday, April 28, 2009

House Update


Here is the long awaited house update, from the outside the addition looks massive and is just as impressive from the inside. Chris has been working hard at getting this place livable. We got the Tinners in and they are finished with the duct work and now Chris is getting the water piping finished hopefully by my birthday (May 5) we are looking at getting an inspections done on the Tin, Plumbing, and Electrical (Joel has to finish the first floor) and then we are onto the laying second floor wurzbo, insulation and sheet rock. Now the new outlook for moving is sometime in June probable toward the later part of the month. Maybe by the time Jasmine is home from horse camp she will have a new room to sleep in.



This is wonderful picture. Nick is helping me point out the hole in our floor made by our master carpenter Grandpa Old Guy. The second floor was getting water logged when we were in the process of getting the roof on so Tim thought it was a great idea to drill a hole in the floor of the second floor. It worked but now we have a hole in the floor. Oh well at least it will be covered up. Right now as I type this post, Tim is doing a wonderful job of building sofets in the addition and getting little odds and end done. This year Father's Day is really to appreciate all that Tim has done for us.

Finally as time slowly progress toward the finish of this addition, the kids are getting antsy for their own space. They are finally getting the concept of what their own rooms mean to them. Almost everyday (now that the weather is nicer) Nick goes and spends some time in his OWN room. He enjoys his room even without the floor, walls or furniture. The view is what he likes the best, it over looks the garage. :-) Hopefully next update will the the final touches!!






No comments:

Post a Comment